{"id":12893,"date":"2019-02-11T20:43:45","date_gmt":"2019-02-11T20:43:45","guid":{"rendered":"https:\/\/gescoconstruction.com\/services\/excavation\/"},"modified":"2025-01-06T15:07:18","modified_gmt":"2025-01-06T15:07:18","slug":"excavation","status":"publish","type":"page","link":"https:\/\/gescoconstruction.com\/en\/services\/excavation\/","title":{"rendered":"Excavation"},"content":{"rendered":"<div class=\"limit-wrapper\"><div class=\"row \"><div class=\"wpv-grid grid-1-1  wpv-first-level first unextended has-extended-padding\" style=\"padding-top:0.05px;padding-bottom:0.05px;\" id=\"wpv-column-e4e31e8335baa2df46b06e3f01d24bf7\" ><div class=\"row \"><div class=\"wpv-grid grid-1-1  first unextended no-extended-padding\" style=\"padding-top:0.05px;padding-bottom:0.05px;\" id=\"wpv-column-fb50c8e8e580dfa2bea50341feeebf34\" ><p>It is important to carefully plan the placement of the house in relation to property boundaries, the position of the sun, and other natural elements. The excavation depth should be determined based on the sanitary and storm sewer connections, as well as to ensure efficient surface water drainage. Additionally, the location of underground utilities, such as electrical, telephone, or gas lines, must be identified beforehand.<\/p>\n<p>It&#8217;s crucial to adhere to the setback requirements imposed by the city concerning property boundaries. At this stage, it is highly recommended to enlist the services of a surveyor to ensure that the placement complies with municipal regulations.<\/p>\n<p>Excavation can begin once the site has been properly laid out. Typically, one day is sufficient for excavation. A trench must be dug to connect to municipal services, if applicable. To ensure that the foundations are not affected by frost or unstable soil, the excavation depth will vary depending on the soil type.<\/p>\n<p>In some cases where the soil is soft and\/or contains significant amounts of water, additional excavation is required to backfill with granular material that will be compacted. In other cases, the presence of rock may prevent the excavation of the basement. In such instances, blasting or rock breaking may be necessary to continue the work.<\/p>\n<p><div id='gallery-1' class='gallery galleryid-12893 gallery-columns-5 gallery-size-single-thumb'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-pour-construction-neuve.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"420\" height=\"320\" src=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-pour-construction-neuve-420x320.jpg\" class=\"attachment-single-thumb size-single-thumb\" alt=\"\" aria-describedby=\"gallery-1-12553\" srcset=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-pour-construction-neuve-420x320.jpg 420w, https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-pour-construction-neuve-262x201.jpg 262w\" sizes=\"auto, (max-width: 420px) 100vw, 420px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-12553'>\n\t\t\t\tExcavation pour construction neuve\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-dagrandissement-e1551907292908.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"420\" height=\"320\" src=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-dagrandissement-e1551907292908-420x320.jpg\" class=\"attachment-single-thumb size-single-thumb\" alt=\"\" aria-describedby=\"gallery-1-12539\" srcset=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-dagrandissement-e1551907292908-420x320.jpg 420w, https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-dagrandissement-e1551907292908-262x201.jpg 262w\" sizes=\"auto, (max-width: 420px) 100vw, 420px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-12539'>\n\t\t\t\tExcavation d&#8217;agrandissement\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"420\" height=\"320\" src=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-1-420x320.jpg\" class=\"attachment-single-thumb size-single-thumb\" alt=\"\" aria-describedby=\"gallery-1-12531\" srcset=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-1-420x320.jpg 420w, https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-1-262x201.jpg 262w\" sizes=\"auto, (max-width: 420px) 100vw, 420px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-12531'>\n\t\t\t\tExcavation \n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"420\" height=\"320\" src=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-4-420x320.jpg\" class=\"attachment-single-thumb size-single-thumb\" alt=\"\" aria-describedby=\"gallery-1-12537\" srcset=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-4-420x320.jpg 420w, https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-4-262x201.jpg 262w\" sizes=\"auto, (max-width: 420px) 100vw, 420px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-12537'>\n\t\t\t\tExcavation\n\t\t\t\t<\/figcaption><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"420\" height=\"320\" src=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-3-420x320.jpg\" class=\"attachment-single-thumb size-single-thumb\" alt=\"\" aria-describedby=\"gallery-1-12535\" srcset=\"https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-3-420x320.jpg 420w, https:\/\/gescoconstruction.com\/wp-content\/uploads\/2019\/02\/Excavation-3-262x201.jpg 262w\" sizes=\"auto, (max-width: 420px) 100vw, 420px\" \/><\/a>\n\t\t\t<\/div>\n\t\t\t\t<figcaption class='wp-caption-text gallery-caption' id='gallery-1-12535'>\n\t\t\t\tExcavation\n\t\t\t\t<\/figcaption><\/figure>\n\t\t<\/div>\n<\/div><\/div><\/div><\/div><\/div>\n<p><!-- Barre de cookies --> <\/p>\n<div id=\"cookie-bar\" class=\"cookie-bar\">\n<p>\n        We use cookies to enhance your experience. By continuing to browse, you accept our<br \/>\n        <a href=\"\/en\/privacy-policy\" target=\"_blank\" class=\"btn-policy\">Privacy Policy<\/a>.\n    <\/p>\n<p>    <button class=\"btn-accept\" onclick=\"acceptCookies()\">Accept<\/button>\n<\/div>\n<style>\n    \/* Style de la barre de cookies *\/\n    .cookie-bar {\n        position: fixed;\n        bottom: 0;\n        left: 0;\n        width: 100%;\n        background-color: #222;\n        color: white;\n        padding: 15px 20px;\n        z-index: 9999;\n        display: flex;\n        justify-content: center;\n        align-items: center;\n        gap: 10px; \/* Espace entre le texte et le bouton *\/\n        box-shadow: 0 -2px 5px rgba(0, 0, 0, 0.5);\n        font-size: 14px;\n    }\n    .cookie-bar p {\n        margin: 0;\n        display: flex;\n        align-items: center;\ncolor: white;\n    }\n    .btn-accept {\n        background-color: #a92405;\n        color: white;\n        padding: 10px 20px;\n        border: none;\n        border-radius: 5px;\n        cursor: pointer;\n        font-size: 14px;\n    }\n    .btn-accept:hover {\n        background-color: #767676;\n    }\n    .btn-policy {\n        color: white;\n        text-decoration: underline;\n        font-weight: bold;\n        margin-left: 5px; \/* Espace entre le texte et le lien *\/\n    }\n    .btn-policy:hover {\n        text-decoration: none;\n        color: #a92405;\n    }\n<\/style>\n<p><script>\n    \/\/ Fonction pour accepter les cookies et masquer la barre\n    function acceptCookies() {\n        const cookieBar = document.getElementById(\"cookie-bar\");\n        cookieBar.style.display = \"none\"; \/\/ Cache la barre\n        document.cookie = \"cookiesAccepted=true; path=\/; max-age=\" + 60 * 60 * 24 * 365; \/\/ Cookie pour 1 an\n    }\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It is important to carefully plan the placement of the house in relation to property boundaries, the position of the sun, and other natural elements. The excavation depth should be determined based on the sanitary and storm sewer connections, as well as to ensure efficient surface water drainage. Additionally, the location of underground utilities, such&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":12886,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-12893","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/pages\/12893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/comments?post=12893"}],"version-history":[{"count":4,"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/pages\/12893\/revisions"}],"predecessor-version":[{"id":13744,"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/pages\/12893\/revisions\/13744"}],"up":[{"embeddable":true,"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/pages\/12886"}],"wp:attachment":[{"href":"https:\/\/gescoconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=12893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}